Kona Maintenance
RAF Daily Activity Sheet
Project Name: HIPPO-3 | Date: 2010/04/12 |
Aircraft: G-V Test: Ferry: |
Flight Hour Allocation: flexible |
Location: Global | 2010/03/22 - 2010/04/15 |
PI: Wofsy / Stephens | PM: Pavel Romashkin |
Research Flight #: | Flight Hrs: | Project Total: |
Data Summary: | |
Data Start Time : UTC |
Data End Time : UTC |
IRU Performance: | IRU Serial #: 176 |
Departure Coordinates: | LAT: | LON: |
Time in Nav: : UTC |
||
Destination Coordinates: | LAT: | LON: |
Destination Read Out 1: | LAT: | LON: |
Destination Read Out 2: | LAT: | LON: |
Time Off: : UTC |
LAT Error | LON Error | Nav Time | THDG | Dest. LAT | ERROR |
Technician Notes:
Pre-flight RF09 noticed that CDP probe is becoming loose on its mount. Disassembled bottom of the probe, re-tightened one fastener. Need to inspect in Colorado.
Project Manager Notes:
VCSEL - Zondlo worked on.
Time server appears to save last position, inits at Hawaii location.
Shipped 2 AWAS Fedex
6 NWAS Fedex
4 Medusa flask boxes Fedex
HIPPO Publications
Data Access
Field Catalog
HIPPO 3 Operations
HIPPO Phases
Facilities & Instruments