8/24/09

RAF Daily Activity Sheet

Project Name: ADELE-SPRITE-HEFT-09 Date: 2008/08/24
Aircraft: G-V
   Test: 8 / 4 hrs
   Ferry: 7 hrs
Flight Hour Allocation: 30/30
Location: Melbourne, FL 2009/08/15
- 2009/09/07
PI: Smith / Nielsen PM:


Allen Schanot




,
Jorgen Jensen




Research Flight #: Flight Hrs: Project Total:


Data Summary:  
Data Start Time
:
UTC
Data End Time
:
UTC


IRU Performance: IRU Serial #: 176
Departure Coordinates: LAT: LON:
Time in Nav:
:
UTC
   
Destination Coordinates: LAT: LON:
Destination Read Out 1: LAT: LON:
Destination Read Out 2: LAT: LON:
Time Off:
:
UTC
   


LAT Error LON Error Nav Time THDG Dest. LAT ERROR




Technician Notes:

SPRITE HARDDOWN

Power + Access 1100-1600 EDT

Reoriented BJ8 probe on Gust Pod.

Found loose wire on digital side camera

No resolution of realtime Google radar updates



Project Manager Notes:

Briefing 1000

PI's to do data processing to access future flt strategies

1) Note  ?  heating of Nose Ebox

ADIFR-GP is a 0-200 sensor replace

Temp in GP running too low @ alt.

need heat interior!