Summertime impact of convective transport and lightning NOx production over North America: modeling dependence on meteorological simulations

Digital Object Identifier
10.5194/acp-9-4315-2009
Lead Author
Zhao, C.
Publisher
Atmos. Chem. Phys.
Full Reference
Zhao, C., Y. Wang, Y. Choi, and T. Zeng, 2009: Summertime impact of convective transport and lightning NOx production over North America: modeling dependence on meteorological simulations. Atmos. Chem. Phys., 9, 4315–4327, doi: 10.5194/acp-9-4315-2009.
Publication Calendar Year
Publication Type
Publications