2-Micron Lidar
One-line Daily Ops Summary
From shane@lidar.ssec.wisc.edu Fri Sep 20 13:34:31 1996 To: rilling Subject: days of LIFT list Here is a quick list of the days of LIFT and what the 2-micron was doing on each of them ... Shane 7-21-96 Arrive / begin setup 7-22-96 setup 7-23-96 setup 7-24-96 setup 7-25-96 setup 7-26-96 Intended first day of ops; vertical, bad data 7-27-96 vertical; questionable data 7-28-96 down 7-29-96 down (DIAL laser broke) 7-30-96 down (Doppler developed 100-MHz ref problem) 7-31-96 scanning (35.3 PPIs, WNW flow, good Cu and mid-level clouds) 8-01-96 vertical (clustering of PM Cu before clearing) 8-02-96 vertical (excellent Cu; continuous RASS) 8-03-96 scanning (35.3 PPIs; good Cu) 8-04-96 vertical (good Cu; DIAL working again) 8-05-96 mixed scans AM, vertical PM (strong S flow) 8-06-96 vertical (good CBL & Cu) 8-07-96 vertical (Gust front case study in PM; continuous RASS) 8-08-96 scanning (50.8 PPIs) 8-09-96 vertical (continuous RASS, low lidar SNR, 10-20s required) 8-10-96 vertical (high-mid clouds, 5s dwell required on Doppler lidar) 8-11-96 down 8-12-96 vertical (5s dwells on HRDL, good deep Cu convection, begin overnight) 8-13-96 vertical (end overnight run) 8-14-96 scanning (interleaved 35.3 & 50.8 PPIs AM, 50.8 PPIs 8-15-96 vertical AM; coordinated scans with DOW in PM 8-16-96 volume/raster scans AM; prof sync AM; vertical with prof PM 8-17-96 down (rain) 8-18-96 down (rain) 8-19-96 vertical (hazy, hot & humid, strong S flow) 8-20-96 vertical (sunny, hot & humid, continuous RASS and vertical on prof) 8-21-96 vertical (cont vert on prof; with 2-hrs prof sync in PM) 8-22-96 scanning (35.3 PPIs; mid-day scanner problems; 2-hrs of prof sync AM) 8-23-96 pack 8-24-96 leave
Data Access
LIFT96 Documentation