Mission Schedule
This is a schedule for the First deployment.
This schedule reflects changes that were necessitated by the replacement of the damaged pressure seal on the baggage door of the GV (1/7/2009) and by repairs to the main cabin door latch (1/8/2009). Currently, the entire schedule is shifted back by two days.
Please refer to the Work Schedule for more details. The schedule below is a general plan, and daily changes may occur that are not reflected in the table below. They will eventually make it into the schedule but the table is harder to keep current, so the last minute changes are here.