GV Floor Plan
 

Link to PDF version.

The payload and aircraft ops require the following staff to be onboard:

  • 1 for SP2-Ozone
  • 1 for PANTHER, UCATS and NWAS
  • 2 for QCLS, one of these is also mission scientist
  • 1 for O2, MEDUSA
  • 1 RAF mechanic
  • 1 ADS technician / safety officer
  • 1 RAF project manager

-------------------------------

8 total seats in the back.

Wing stores: The project will fly with 4 PMS instruments: RWI: MTP; RWO: UHSAS; LWI: CDP; LWO: 25 um 2D-C.

 

Images