Logbook_Contents
Entry Date Title Site Author #Graphics
158 Fri 01-Oct-2004 Dry Ice in Hydra all burns
157 Fri 01-Oct-2004 "West" Hydra Inlet (along como creek) all burns
156 Fri 01-Oct-2004 Daily status all young
155 Thu 30-Sep-2004 Daily status all young
154 Wed 29-Sep-2004 Daily status all young
153 Wed 29-Sep-2004 Test on T.2m.a pine semmer
152 Wed 29-Sep-2004 LICOR 7500 up on Marigold aspen semmer
151 Wed 29-Sep-2004 marigold reboot aspen oncley
150 Tue 28-Sep-2004 today's tasks all oncley
149 Tue 28-Sep-2004 Daily status all young
148 Tue 28-Sep-2004 some ids all oncley
147 Mon 27-Sep-2004 Daily status all young
146 Mon 27-Sep-2004 Willow down on 9/24, afternoon willow semmer
145 Mon 27-Sep-2004 work at Aspen on 9/24, TRH aspen semmer
144 Sat 25-Sep-2004 power glitch, data systems reboot all maclean
143 Fri 24-Sep-2004 Daily status all young
142 Thu 23-Sep-2004 Daily status all young
141 Wed 22-Sep-2004 today's tasks all oncley
140 Wed 22-Sep-2004 Daily status all young
139 Tue 21-Sep-2004 Huff&Puff cont'd pine oncley 1
138 Fri 17-Sep-2004 task list all oncley
137 Fri 17-Sep-2004 hydra stuff pine oncley
136 Fri 17-Sep-2004 tour all oncley
135 Fri 17-Sep-2004 Daily status all young
134 Wed 15-Sep-2004 status all oncley
133 Wed 15-Sep-2004 hydra calibration pine oncley
132 Mon 13-Sep-2004 Daily status all young
131 Mon 13-Sep-2004 Mote positions all oncley
130 Mon 13-Sep-2004 changed willow's antenna willow oncley
129 Sun 12-Sep-2004 network at willow willow maclean
128 Fri 10-Sep-2004 hydra program big change pine oncley
127 Fri 10-Sep-2004 Daily status all young
126 Thu 09-Sep-2004 hydra reconfigured pine oncley
125 Thu 09-Sep-2004 today's tasks all oncley
124 Thu 09-Sep-2004 Daily status all young
123 Wed 08-Sep-2004 today's tasks all oncley
122 Wed 08-Sep-2004 Puff Tests at Hydra pine burns
121 Wed 08-Sep-2004 Daily status all young
120 Tue 07-Sep-2004 Daily status all young
119 Fri 03-Sep-2004 Daily status all young
118 Thu 02-Sep-2004 Daily status all young
117 Wed 01-Sep-2004 Daily status all young
116 Wed 01-Sep-2004 aircoa2 restarted with new code pine maclean
115 Wed 01-Sep-2004 radiometers shadowed by tower all oncley 1
114 Tue 31-Aug-2004 sensor heights all oncley
113 Tue 31-Aug-2004 today's tasks all oncley
112 Tue 31-Aug-2004 Daily status all young
111 Mon 30-Aug-2004 Daily status all young
110 Mon 30-Aug-2004 status all oncley
109 Sat 28-Aug-2004 another quicky status all oncley
108 Sat 28-Aug-2004 Oscillation in 30m TRH aspen oncley
107 Fri 27-Aug-2004 status all oncley
106 Fri 27-Aug-2004 hilo.a cals changed from 9 to 19 hrs aspen oncley
105 Fri 27-Aug-2004 site visit all oncley
104 Fri 27-Aug-2004 site visit all oncley
103 Fri 27-Aug-2004 site visits all oncley
102 Tue 24-Aug-2004 co2 cylinder information (Britt Cal numbers + pressures, etc) all burns
101 Tue 24-Aug-2004 Daily status all young
100 Mon 23-Aug-2004 Daily status all young
99 Mon 23-Aug-2004 hilo.a recal aspen oncley
98 Sat 21-Aug-2004 10m aspen sonic dead aspen oncley
97 Sat 21-Aug-2004 willow hilo cals now 19hrs willow oncley
96 Fri 20-Aug-2004 Mote #16 working aspen militzer
95 Fri 20-Aug-2004 baro working pine militzer
94 Fri 20-Aug-2004 2m TRH fan swapped pine militzer
93 Fri 20-Aug-2004 1m TRH fan swapped willow militzer
92 Fri 20-Aug-2004 Mote Tsoils Planted pine militzer
91 Fri 20-Aug-2004 Gas Readings Willow...Ref empty and... aspen militzer
90 Fri 20-Aug-2004 Gas Readings Aspen aspen militzer
89 Fri 20-Aug-2004 Daily status all young
88 Thu 19-Aug-2004 Daily status all young
87 Wed 18-Aug-2004 Daily status all young
86 Tue 17-Aug-2004 li7000 settings all oncley
85 Tue 17-Aug-2004 Tsoil work willow militzer
84 Tue 17-Aug-2004 Cleaned 2m Kh20 willow militzer
83 Tue 17-Aug-2004 Tsoil work pine militzer
82 Tue 17-Aug-2004 Tsoil work aspen militzer
81 Tue 17-Aug-2004 Cleaned 2m Kh20 aspen militzer
80 Tue 17-Aug-2004 Reset Aircoa aspen militzer
79 Tue 17-Aug-2004 Daily status all young
78 Fri 13-Aug-2004 co2 fluxes all oncley
76 Fri 13-Aug-2004 overall status all oncley
75 Fri 13-Aug-2004 today's tasks all oncley
74 Thu 12-Aug-2004 today's tasks all oncley
73 Thu 12-Aug-2004 krypton test/clean pine oncley
72 Tue 10-Aug-2004 Cal gas pressures militzer
71 Tue 10-Aug-2004 Tsoil Mote Work, All Sites all militzer
70 Tue 10-Aug-2004 1m / 10m UW Sonics removed pine militzer
69 Tue 10-Aug-2004 All 1M Krypton Cleaned all militzer
68 Tue 10-Aug-2004 HiLo delays all oncley
67 Tue 10-Aug-2004 Rnet/PAR calibration willow oncley
66 Tue 10-Aug-2004 windsonic format change willow oncley
65 Tue 10-Aug-2004 PAR gain changed aspen oncley
64 Mon 09-Aug-2004 boom angles all oncley
63 Mon 09-Aug-2004 all kryptons "cleaned" all oncley
62 Fri 06-Aug-2004 now getting li7500 for the first time :( pine oncley
61 Fri 06-Aug-2004 co2 lag times all oncley
60 Fri 06-Aug-2004 li6251 calibration factors willow oncley
59 Fri 06-Aug-2004 crude willow cal willow oncley
58 Fri 06-Aug-2004 Rnet/PAR data willow oncley
57 Thu 05-Aug-2004 ALL (major) SENSORS UP! all oncley
56 Thu 05-Aug-2004 Routine CO2 systems' chores all delany
55 Thu 05-Aug-2004 Hydra inlets pine delany
54 Tue 03-Aug-2004 rad sensors all oncley
53 Tue 03-Aug-2004 guy wire tensions pine oncley
52 Tue 03-Aug-2004 Cal gas locations and pressures all delany
51 Tue 03-Aug-2004 hydra li7000 reprogrammed pine oncley
50 Tue 03-Aug-2004 Tsoil status all oncley
49 Tue 03-Aug-2004 yesterday's tasks all oncley
48 Sat 31-Jul-2004 marigold li7000 reset aspen oncley
47 Fri 30-Jul-2004 WSU gone pine oncley
46 Fri 30-Jul-2004 today's tasks all oncley
45 Fri 30-Jul-2004 marigold up at aspen aspen maclean
44 Thu 29-Jul-2004 today's work all oncley
43 Thu 29-Jul-2004 Yesterday's activities all oncley
42 Thu 29-Jul-2004 Mote14 installed at Aspen aspen oncley
41 Tue 27-Jul-2004 today's work all oncley
40 Tue 27-Jul-2004 cosmos work willow oncley
39 Mon 26-Jul-2004 TRH reset willow oncley
38 Mon 26-Jul-2004 sensor list aspen oncley
37 Fri 23-Jul-2004 power-down reboots all oncley
36 Thu 22-Jul-2004 task list all oncley
35 Thu 22-Jul-2004 csat.17m.w down willow oncley
34 Thu 22-Jul-2004 daisy crashes pine oncley
33 Fri 16-Jul-2004 fog turned to rain all oncley
32 Fri 16-Jul-2004 aspen almost up aspen oncley
31 Thu 15-Jul-2004 opto22 running in old mode pine oncley
30 Thu 15-Jul-2004 aspen sensors mounted aspen oncley
29 Wed 14-Jul-2004 daisy rebooted 2-3 times pine oncley
28 Wed 14-Jul-2004 aspen booms mostly up aspen oncley
27 Tue 13-Jul-2004 Willow visit willow semmer
26 Mon 12-Jul-2004 Visit to Willow willow semmer
25 Tue 06-Jul-2004 2m krypton at willow willow semmer
24 Tue 06-Jul-2004 Sonic work at willow willow semmer
23 Tue 29-Jun-2004 Sensor IDs at Pine pine semmer
22 Mon 28-Jun-2004 stuff at willow willow oncley
21 Mon 28-Jun-2004 daisy up at pine! pine oncley
20 Thu 24-Jun-2004 cosmos rebooted willow oncley
19 Thu 24-Jun-2004 mote23 erratic willow oncley
18 Thu 24-Jun-2004 emerald #1 died willow oncley
17 Mon 21-Jun-2004 Tsfc coefficients corrected willow oncley
16 Mon 21-Jun-2004 hilo installed willow oncley
15 Sun 20-Jun-2004 Changed willow 2m csat3 rate to 30hz willow maclean
14 Fri 18-Jun-2004 CUFF Breezecom antenna change base semmer
13 Fri 18-Jun-2004 cosmos (willow) back up willow semmer
12 Fri 18-Jun-2004 looking at relay values all maclean
11 Tue 15-Jun-2004 network to willow sick willow maclean
10 Tue 15-Jun-2004 network config all maclean
9 Tue 15-Jun-2004 data system time all maclean
8 Tue 15-Jun-2004 ndaqstatus all maclean
7 Fri 11-Jun-2004 Work at Willow willow semmer
6 Fri 11-Jun-2004 Coeffs for Rnet and Par on Willow willow semmer
5 Fri 11-Jun-2004 willow 2m TRH ? willow semmer
4 Fri 11-Jun-2004 Willow sensor IDs willow semmer
3 Fri 11-Jun-2004 Willow Installation willow semmer
2 Wed 09-Jun-2004 Willow system up willow maclean
1 Mon 07-Jun-2004 Logbook created none maclean



158: co2, Site all, Fri 01-Oct-2004 15:34:47 MDT, Dry Ice in Hydra

On Sept 30th at ~15:40 MST:

dropped a chunk of dry ice in the hydra box to check for any
jar leakage.
157: co2, Site all, Fri 01-Oct-2004 15:26:48 MDT, "West" Hydra Inlet (along como creek)

Some notes about moving the west inlet for the hydra:

1. On Monday, August 16th at 14:50 MST:

Repositioned the hydra west inlet to be directly above
the creek (previously it was slightly to the side of the creek).  
Note:  the old location of the inlet was about 20m North and 
10m East of the creek.  For more details of the old vs new
inlet locations see:

  http://urquell.colorado.edu/sean/plots_cme/niwot_map_040818.ps
2. On Thursday, September 30th at ~15:30 MST: 

Moved the hydra west inlet from being 100cm above como creek to
being 160cm above como creek (160cm above the water at como creek was
approximately 100cm above the north bank of como creek).  Photos of
the location of the west inlet can be seen at:

  http://urquell.colorado.edu/photos/photos_040930.html

(these photos also show the lower inlets of hydra on the pine profile)
156: status, Site all, Fri 01-Oct-2004 11:20:33 MDT, Daily status

Notes:
-Last day of operations
Looking through early 9/29
		Willow			Pine			Aspen
Mote Vbatt	Ok			OK		   	OK
(>2.7) 		 		

Pressure	OK			OK			OK

Radiation	OK			OK			OK 
Krypton(V)	------------------Kryptons got wet----------------------------
(>0.1)								

Tsoils		A - OK			A - 2 bad		A -1 lg spike
		B - one lg spikes	B - OK			B- 2 spikes
		C - OK			C - OK		 	C -OK
		D - OK			D - OK			D - OK
Sonics		having problems	        OK			Sonic temp &
		most likely from		    	    	variance not 
		getting wet		   		  	looking good.
Tsfc		OK			OK			OK
T/RH		no data from 2m		OK		        OK

Wnd Spd		OK			10 m had lg spike	OK
MR profiles	OK			OK	 		OK
co2		OK			w'co2mr'.pine(2m)	OK
					died on 9/29 1800 MST 
CO2		OK			CO2 mr vs distance	OK 							profiles have missing
                                        data.	
155: status, Site all, Thu 30-Sep-2004 16:17:26 MDT, Daily status

Tasks:
- reconnect 2 tsoilB sensors at aspen
- disconnect 2 bad tsoilA sensors at pine
-fix 2m tsfc sensors @ pine and aspen
-fix 1m sonic at willow
-fix 17m sonics at pine and aspen
-fix 2m TRH at willow
-fix 2m CO2 sensor @ pine

Notes:
-SITES MOST LIKELY HAD RAIN ON 9/29
Looking through early 9/29
		Willow			Pine			Aspen
Mote Vbatt	Ok			OK		   	OK
(>2.7) 		 		

Pressure	OK			OK			OK

Radiation	OK			OK			OK 
Krypton(V)	------------------Kryptons got wet----------------------------
(>0.1)								

Tsoils		A - OK			A - 2 bad		A -1 lg spike
		B - some spikes		B - OK			B- OK
		C - OK			C - 2 lg spikes 	C -OK
		D - OK			D - OK			D - OK
Sonics		1m died @ 2000MST	17m flagged	        17m lost @
		2m & 6m having problems	died 9/28	        1800 MST 9/28
					10m variance plots      10m missing some
					look suspicious		data

Tsfc		OK			2m died @ 1800 on	lost 2m @ 1800
					on 9/28			on 9/28
T/RH		no data from 2m		OK		        OK

Wnd Spd		OK			OK			10m data gap
MR profiles	OK			OK	 		OK
co2		OK			w'co2mr'.pine(2m)	OK
					died on 9/29 1800 MST 
CO2		OK			CO2 mr vs distance	OK 							profiles have missing
                                        data.	
154: status, Site all, Wed 29-Sep-2004 16:15:21 MDT, Daily status

Tasks:
- reconnect 2 tsoilB sensors at aspen
- disconnect 2 bad tsoilA sensors at pine
Notes:
-Willow communication link back up
-pine 2m CO2 sensor died
-no data from 2m T/RH at willow
-missing some latent heat measurements.
-something strange happened at aspen at 1800 that affected all sensors
Looking through early 9/28
		Willow			Pine			Aspen
Mote Vbatt	Ok			OK		   	OK
(>2.7) 		 		

Pressure	OK			OK			OK

Radiation	OK			OK			OK 
Krypton(V)	OK			OK			OK
(>0.1)								

Tsoils		A - OK			A - 2 bad		A -missing data
								gap				
		B - OK			B - OK			B- missing data
								   gap			
		C - 1 lg spike		C - OK			C -missing data
								   gap

		D - OK			D - OK			D -missing data
								   gap

Sonics		OK			17m flagged	        17m 
					died			flagged lost
					on 9/28			it @ 1800 MST

Tsfc		OK			OK			lost 2m @ 1800
T/RH		no data from 2m		OK		        OK

Wnd Spd		OK			OK			OK
MR profiles	OK			OK	 		OK
co2		OK			w'co2mr'.pine(2m)	OK
					died at 1800 MST
CO2		none			CO2 mr vs distance	OK 							profiles have missing
                                        data.	
153: hygro_thermometers, Site pine, Wed 29-Sep-2004 12:51:08 MDT, Test on T.2m.a

I tried another test on T.2m.a to see if we could find the noise source.
THe 50Y probe was changed. The noise still exists. This test took place
between 12:00 and 13:30 local time.

152: co2, Site aspen, Wed 29-Sep-2004 12:49:41 MDT, LICOR 7500 up on Marigold

THe Licor 7500 is now going through serial port 215 on Marigold (pine).
151: data_system, Site aspen, Wed 29-Sep-2004 11:33:16 MDT, marigold reboot

Just rebooted marigold (twice) to load configs which put Li7500 on channel 215,
since 212's Emerald port was stolen by 200, etc.

150: LOG, Site all, Tue 28-Sep-2004 21:49:39 MDT, today's tasks

Chris and I arrived about 4:30!

willow:
- tried out the NETS e-net adaptor.  it worked for my laptop, but wouldn't let
  any other devices (cosmos,aircoa1,aircoa3) through.  ended up reinstalling
  breezecom (yet again!) after managing to completely shut off communication to
  the NETS Cisco box.
- rebooted cosmos several times
- left aircoa3 unplugged to see if this helps

pine:
- cycled power on upper breakout box, which revived CR10x (rads)
- changed Hydra dessicant
- removed Li7500
- retrieved my hat!

aspen:
- installed Li7500 and rebooted (to change config), but then marigold died.
  marigold back up when I checked at 9:30pm -- did Gordon fix something?
  li7500 data still not coming in.  might be strange serial connections
  inside DAQ box.

left site about 6:20pm
149: status, Site all, Tue 28-Sep-2004 16:05:35 MDT, Daily status

Tasks:
- reconnect 2 tsoilB sensors at aspen
- disconnect 2 bad tsoilA sensors at pine
- move 6m T/RH sensor at aspen back to 2m

Notes:
-Willow communication link still down - basically no data since 9/26 
- CO2 sensors at willow (2m and 17 m) stopped working on 9/25.
Looking through early 9/27
		Willow			Pine			Aspen
Mote Vbatt	communication link	VbattC missing some      OK
(>2.7) 		still down 		data

Pressure	none			OK			OK

Radiation	none			chk plot to see if	OK 
					sensor is working

Krypton(V)	none			All may have gotten wet - voltage @ 0
(>0.1)					at time thrroughout the day			

Tsoils		A - none		A - 2 bad		A -OK
		B - none		B - OK			B- missing data
								   gap			
		C - none		C - OK			C - OK

		D - none		D - OK			D - OK 	

Sonics		none			OK		        2m and 17m 
								flagged
Tsfc		none			OK			OK
T/RH		none			OK		        no sensor @ 2m

Wnd Spd		none			spike in 10m wind	15 & 17m missing
					spd @ 0000 MST          some data
MR profiles	none			OK	 		OK
co2		no calibrations		OK			OK
		2 hilo sensors 
		stopped working		

CO2		none			OK			OK 								
148: LOG, Site all, Tue 28-Sep-2004 13:36:52 MDT, some ids

Some sensor ids:

Willow:
kh2o.2m 1392
kh2o.17m 1391

Pine:
kh2o.2m 1389
kh2o.30m 1133
csat.2m 672
csat.30m 674

Aspen:
kh2o.2m 1390
kh2o.30m 1394
nuw.1m nuw6 (tram)
csat.2m 677
gill.6m
atik.10m 980505
atik.17m 980504
csat.30m 537 (536 initially)

147: status, Site all, Mon 27-Sep-2004 15:35:19 MDT, Daily status

Tasks:
- reconnect 2 tsoilB sensors at aspen
- disconnect 2 bad tsoilA sensors at pine
- move 6m T/RH sensor at aspen back to 2m

Notes:
-Willow communication link was down for a time.
- CO2 sensors at willow (2m and 17 m) stopped working on 9/25.
Looking through early 9/26
		Willow			Pine			Aspen
Mote Vbatt	communication link	VbattC variable         OK
(>2.7) 		was down for a while

Pressure	OK			OK			OK

Radiation	OK			chk plot to see if	OK 
					sensor is working

Krypton(V)	2m dropped to 0		OK			2m dropped to 0
(>0.1)		evening of 9/26					evening of 9/26

Tsoils		A - 1 acting up		A - 2 bad		A -OK
		B - OK			B - OK			B- OK			

		C - OK			C - some missing data	C - OK

		D - OK			D - one lg spike	D - missing data 									gap

Sonics		OK			OK		        OK
Tsfc		OK			OK			OK
T/RH		OK			OK		    6m was moved from	 							    2m back to 6m

Wnd Spd		OK			OK			OK
MR profiles	OK			OK	 		OK
co2		no calibrations		OK			OK
		2 hilo sensors 
		stopped working		

CO2		OK			OK			OK 								
146: network, Site willow, Mon 27-Sep-2004 11:25:24 MDT, Willow down on 9/24, afternoon

While working at Aspen, Andy came by and said the communication link from
Willow was down. So I stopped the work at Aspen to go to Willow. At Willow
I found the Breezecom communication light was read not green. I recycled
power on the breezecom and that got it going. Back at the CUFF trailer I
rebooted cosmos to get it going.

145: hygro_thermometers, Site aspen, Mon 27-Sep-2004 11:17:15 MDT, work at Aspen on 9/24, TRH

I was working on the TRH sensors at Aspen between 1:30 and 3:30 on 9/24.
During this time I moved the 6 meter TRH back up to 6 meters.
TESTS:
  There was 3 tests I conducted on the 2m TRH. The first was to disconnect
the TRH from the data system completely and see if noise was still existing
on the temperature channel. The results showed a small amount of variation,
approximately .02 C. It was not obvious if this was a noise problem of just
random changes in the atmosphere. The second test was too put a fixed voltage
reference in on the temperature channel. In this case the output signal was
solid with no changes.
 The third test was with the reference signal as input with the TRH
communicating with marigold. Based on Splus plots the noise was not present.
As a fourth test we will change the 50Y probe. Unfortunately I do not have
an extra probe. Will try in the next day or two.
144: data_system, Site all, Sat 25-Sep-2004 21:15:09 MDT, power glitch, data systems reboot


A power glitch today caused the data systems to reboot.

Here are the messages in /usr/lib/powerchute/powerchute.log:

200000 09/25/04 12:06:31 UPS on battery
100300 09/25/04 12:06:31 Normal power restored: UPS on line
200003 09/25/04 12:46:13 UPS on battery: Blackout 051.3 V
100300 09/25/04 12:46:17 Normal power restored: UPS on line

143: status, Site all, Fri 24-Sep-2004 15:10:32 MDT, Daily status

Tasks:
- reconnect 2 tsoilB sensors at aspen
- disconnect 2 bad tsoilA sensors at pine
- move 6m T/RH sensor at aspen back to 2m
Looking through early 9/24
		Willow			Pine			Aspen
Mote Vbatt	OK			OK                      OK
(>2.7) 		

Pressure	OK			OK			OK

Radiation	OK			OK			OK 

Krypton(V)	OK			OK			OK
(>0.1)								

Tsoils		A - 1 acting up		A - 2 bad		A -some spikes
		B - 1 large spike	B - OK			B- 2 down &
							       some missing data			

		C - OK			C - some missing data	C -1 lg spike

		D - OK			D - one sm  spike	D - OK

Sonics		data was flagged 	OK		        OK
		but look ok.			

Tsfc		OK			OK			OK
T/RH		OK			OK		    6m was moved to 2m	 

Wnd Spd		OK			OK			OK
MR profiles	OK			6m may be too 		OK
					moist?

co2		OK			OK			OK
CO2		OK			OK			OK 								
142: status, Site all, Thu 23-Sep-2004 15:56:39 MDT, Daily status

Tasks:
- reconnect 2 tsoilB sensors at aspen
-willow 1m T/RH sensor crashed on 9/15
-pine 17m sonic died on 9/16
-aspen 17 m sonic died on 9/16
Looking through early 9/22
		Willow			Pine			Aspen
Mote Vbatt	missing data between    OK                      OK- batt changed
(>2.7) 		1400-0200 MST. 1 batt
                changed

Pressure	OK			OK			OK

Radiation	OK			OK			OK 

Krypton(V)	OK			OK			OK
(>0.1)								

Tsoils		A - OK			A - 2 bad		A -1 lg spike
		B - OK			B - 2 spikes		B- 2 down 			

		C - OK			C - OK			C -1 spike

		D - OK			D - some spikes	   	D - OK

Sonics		Missing data from  	OK		        OK
		1800-0200 MST				     
		snow on gills			

Tsfc		OK			OK			OK
T/RH		1m died	on 9/15		OK			6m moved to 2m	 

Wnd Spd		OK			OK			OK
MR profiles	OK			6m may be too 		OK
					moist?

co2		no calibration		OK			OK
		since 9/22 0000MST			

CO2		OK			OK			OK 								
141: LOG, Site all, Wed 22-Sep-2004 17:22:52 MDT, today's tasks

Aspen:
- installed new hilo pump -- works a lot better (but needed to be connected to
  the transformer input
- Moved TRH.6m to 2m to test affect of noise
- changed mote 16 batteries
- swapped HiCal cylinders with one of Sean's labeled 401.8ppm.  I didn't 
  remember how to set the regulator, so I just made it about equal to LoCal.

Willow:
- changed mote 20 batteries
- installed D-Link e-net adaptor, but made things worse. 
  Chris will go back up tonight to reinstall the Breezecom

140: status, Site all, Wed 22-Sep-2004 15:57:09 MDT, Daily status

Tasks:
- reconnect 2 tsoilB sensors at aspen
-willow 1m T/RH sensor crashed on 9/15
-pine 17m sonic died on 9/16
-aspen 17 m sonic died on 9/16

Notes:
- storm blew in on 9/21
- no vbatt data from pine and aspen
- kryptons got wet
- sonics out of whack from snow

Looking through early 9/21
		Willow			Pine			Aspen
Mote Vbatt	OK		  no data after 0200	no data after 0200
(>2.7) 		 

Pressure	OK			OK			OK

Radiation	OK			OK			OK 

Krypton(V)	wet			wet			wet
(>0.1)								

Tsoils		A - OK			A - 2 bad		A - OK
		B - OK			B - OK			B- 2 down 			

		C - OK			C - data sporadic	C - OK

		D - OK			D - OK		   	D - OK

Sonics		Data heavily flagged  	data flagged         data flagged
		data sporadic		and sporadic	     and sporadic
		1m sonic dying		1m sonic dying

Tsfc		OK			OK			OK
T/RH		1m died	on 9/15		OK			OK	 

Wnd Spd		profiles missing	profiles missing	profiles missing
		data			data			data
		Gills way off!
MR profiles	OK			OK			OK

co2		OK			OK			OK
CO2		OK			OK			OK 								
139: co2, Site pine, Tue 21-Sep-2004 13:16:46 MDT, Huff&Puff cont'd