Logbook_Contents
Entry | Date | Title | Site | Author | #Graphics |
---|---|---|---|---|---|
158 | Fri 01-Oct-2004 | Dry Ice in Hydra | all | burns | |
157 | Fri 01-Oct-2004 | "West" Hydra Inlet (along como creek) | all | burns | |
156 | Fri 01-Oct-2004 | Daily status | all | young | |
155 | Thu 30-Sep-2004 | Daily status | all | young | |
154 | Wed 29-Sep-2004 | Daily status | all | young | |
153 | Wed 29-Sep-2004 | Test on T.2m.a | pine | semmer | |
152 | Wed 29-Sep-2004 | LICOR 7500 up on Marigold | aspen | semmer | |
151 | Wed 29-Sep-2004 | marigold reboot | aspen | oncley | |
150 | Tue 28-Sep-2004 | today's tasks | all | oncley | |
149 | Tue 28-Sep-2004 | Daily status | all | young | |
148 | Tue 28-Sep-2004 | some ids | all | oncley | |
147 | Mon 27-Sep-2004 | Daily status | all | young | |
146 | Mon 27-Sep-2004 | Willow down on 9/24, afternoon | willow | semmer | |
145 | Mon 27-Sep-2004 | work at Aspen on 9/24, TRH | aspen | semmer | |
144 | Sat 25-Sep-2004 | power glitch, data systems reboot | all | maclean | |
143 | Fri 24-Sep-2004 | Daily status | all | young | |
142 | Thu 23-Sep-2004 | Daily status | all | young | |
141 | Wed 22-Sep-2004 | today's tasks | all | oncley | |
140 | Wed 22-Sep-2004 | Daily status | all | young | |
139 | Tue 21-Sep-2004 | Huff&Puff cont'd | pine | oncley | 1 |
138 | Fri 17-Sep-2004 | task list | all | oncley | |
137 | Fri 17-Sep-2004 | hydra stuff | pine | oncley | |
136 | Fri 17-Sep-2004 | tour | all | oncley | |
135 | Fri 17-Sep-2004 | Daily status | all | young | |
134 | Wed 15-Sep-2004 | status | all | oncley | |
133 | Wed 15-Sep-2004 | hydra calibration | pine | oncley | |
132 | Mon 13-Sep-2004 | Daily status | all | young | |
131 | Mon 13-Sep-2004 | Mote positions | all | oncley | |
130 | Mon 13-Sep-2004 | changed willow's antenna | willow | oncley | |
129 | Sun 12-Sep-2004 | network at willow | willow | maclean | |
128 | Fri 10-Sep-2004 | hydra program big change | pine | oncley | |
127 | Fri 10-Sep-2004 | Daily status | all | young | |
126 | Thu 09-Sep-2004 | hydra reconfigured | pine | oncley | |
125 | Thu 09-Sep-2004 | today's tasks | all | oncley | |
124 | Thu 09-Sep-2004 | Daily status | all | young | |
123 | Wed 08-Sep-2004 | today's tasks | all | oncley | |
122 | Wed 08-Sep-2004 | Puff Tests at Hydra | pine | burns | |
121 | Wed 08-Sep-2004 | Daily status | all | young | |
120 | Tue 07-Sep-2004 | Daily status | all | young | |
119 | Fri 03-Sep-2004 | Daily status | all | young | |
118 | Thu 02-Sep-2004 | Daily status | all | young | |
117 | Wed 01-Sep-2004 | Daily status | all | young | |
116 | Wed 01-Sep-2004 | aircoa2 restarted with new code | pine | maclean | |
115 | Wed 01-Sep-2004 | radiometers shadowed by tower | all | oncley | 1 |
114 | Tue 31-Aug-2004 | sensor heights | all | oncley | |
113 | Tue 31-Aug-2004 | today's tasks | all | oncley | |
112 | Tue 31-Aug-2004 | Daily status | all | young | |
111 | Mon 30-Aug-2004 | Daily status | all | young | |
110 | Mon 30-Aug-2004 | status | all | oncley | |
109 | Sat 28-Aug-2004 | another quicky status | all | oncley | |
108 | Sat 28-Aug-2004 | Oscillation in 30m TRH | aspen | oncley | |
107 | Fri 27-Aug-2004 | status | all | oncley | |
106 | Fri 27-Aug-2004 | hilo.a cals changed from 9 to 19 hrs | aspen | oncley | |
105 | Fri 27-Aug-2004 | site visit | all | oncley | |
104 | Fri 27-Aug-2004 | site visit | all | oncley | |
103 | Fri 27-Aug-2004 | site visits | all | oncley | |
102 | Tue 24-Aug-2004 | co2 cylinder information (Britt Cal numbers + pressures, etc) | all | burns | |
101 | Tue 24-Aug-2004 | Daily status | all | young | |
100 | Mon 23-Aug-2004 | Daily status | all | young | |
99 | Mon 23-Aug-2004 | hilo.a recal | aspen | oncley | |
98 | Sat 21-Aug-2004 | 10m aspen sonic dead | aspen | oncley | |
97 | Sat 21-Aug-2004 | willow hilo cals now 19hrs | willow | oncley | |
96 | Fri 20-Aug-2004 | Mote #16 working | aspen | militzer | |
95 | Fri 20-Aug-2004 | baro working | pine | militzer | |
94 | Fri 20-Aug-2004 | 2m TRH fan swapped | pine | militzer | |
93 | Fri 20-Aug-2004 | 1m TRH fan swapped | willow | militzer | |
92 | Fri 20-Aug-2004 | Mote Tsoils Planted | pine | militzer | |
91 | Fri 20-Aug-2004 | Gas Readings Willow...Ref empty and... | aspen | militzer | |
90 | Fri 20-Aug-2004 | Gas Readings Aspen | aspen | militzer | |
89 | Fri 20-Aug-2004 | Daily status | all | young | |
88 | Thu 19-Aug-2004 | Daily status | all | young | |
87 | Wed 18-Aug-2004 | Daily status | all | young | |
86 | Tue 17-Aug-2004 | li7000 settings | all | oncley | |
85 | Tue 17-Aug-2004 | Tsoil work | willow | militzer | |
84 | Tue 17-Aug-2004 | Cleaned 2m Kh20 | willow | militzer | |
83 | Tue 17-Aug-2004 | Tsoil work | pine | militzer | |
82 | Tue 17-Aug-2004 | Tsoil work | aspen | militzer | |
81 | Tue 17-Aug-2004 | Cleaned 2m Kh20 | aspen | militzer | |
80 | Tue 17-Aug-2004 | Reset Aircoa | aspen | militzer | |
79 | Tue 17-Aug-2004 | Daily status | all | young | |
78 | Fri 13-Aug-2004 | co2 fluxes | all | oncley | |
76 | Fri 13-Aug-2004 | overall status | all | oncley | |
75 | Fri 13-Aug-2004 | today's tasks | all | oncley | |
74 | Thu 12-Aug-2004 | today's tasks | all | oncley | |
73 | Thu 12-Aug-2004 | krypton test/clean | pine | oncley | |
72 | Tue 10-Aug-2004 | Cal gas pressures | militzer | ||
71 | Tue 10-Aug-2004 | Tsoil Mote Work, All Sites | all | militzer | |
70 | Tue 10-Aug-2004 | 1m / 10m UW Sonics removed | pine | militzer | |
69 | Tue 10-Aug-2004 | All 1M Krypton Cleaned | all | militzer | |
68 | Tue 10-Aug-2004 | HiLo delays | all | oncley | |
67 | Tue 10-Aug-2004 | Rnet/PAR calibration | willow | oncley | |
66 | Tue 10-Aug-2004 | windsonic format change | willow | oncley | |
65 | Tue 10-Aug-2004 | PAR gain changed | aspen | oncley | |
64 | Mon 09-Aug-2004 | boom angles | all | oncley | |
63 | Mon 09-Aug-2004 | all kryptons "cleaned" | all | oncley | |
62 | Fri 06-Aug-2004 | now getting li7500 for the first time :( | pine | oncley | |
61 | Fri 06-Aug-2004 | co2 lag times | all | oncley | |
60 | Fri 06-Aug-2004 | li6251 calibration factors | willow | oncley | |
59 | Fri 06-Aug-2004 | crude willow cal | willow | oncley | |
58 | Fri 06-Aug-2004 | Rnet/PAR data | willow | oncley | |
57 | Thu 05-Aug-2004 | ALL (major) SENSORS UP! | all | oncley | |
56 | Thu 05-Aug-2004 | Routine CO2 systems' chores | all | delany | |
55 | Thu 05-Aug-2004 | Hydra inlets | pine | delany | |
54 | Tue 03-Aug-2004 | rad sensors | all | oncley | |
53 | Tue 03-Aug-2004 | guy wire tensions | pine | oncley | |
52 | Tue 03-Aug-2004 | Cal gas locations and pressures | all | delany | |
51 | Tue 03-Aug-2004 | hydra li7000 reprogrammed | pine | oncley | |
50 | Tue 03-Aug-2004 | Tsoil status | all | oncley | |
49 | Tue 03-Aug-2004 | yesterday's tasks | all | oncley | |
48 | Sat 31-Jul-2004 | marigold li7000 reset | aspen | oncley | |
47 | Fri 30-Jul-2004 | WSU gone | pine | oncley | |
46 | Fri 30-Jul-2004 | today's tasks | all | oncley | |
45 | Fri 30-Jul-2004 | marigold up at aspen | aspen | maclean | |
44 | Thu 29-Jul-2004 | today's work | all | oncley | |
43 | Thu 29-Jul-2004 | Yesterday's activities | all | oncley | |
42 | Thu 29-Jul-2004 | Mote14 installed at Aspen | aspen | oncley | |
41 | Tue 27-Jul-2004 | today's work | all | oncley | |
40 | Tue 27-Jul-2004 | cosmos work | willow | oncley | |
39 | Mon 26-Jul-2004 | TRH reset | willow | oncley | |
38 | Mon 26-Jul-2004 | sensor list | aspen | oncley | |
37 | Fri 23-Jul-2004 | power-down reboots | all | oncley | |
36 | Thu 22-Jul-2004 | task list | all | oncley | |
35 | Thu 22-Jul-2004 | csat.17m.w down | willow | oncley | |
34 | Thu 22-Jul-2004 | daisy crashes | pine | oncley | |
33 | Fri 16-Jul-2004 | fog turned to rain | all | oncley | |
32 | Fri 16-Jul-2004 | aspen almost up | aspen | oncley | |
31 | Thu 15-Jul-2004 | opto22 running in old mode | pine | oncley | |
30 | Thu 15-Jul-2004 | aspen sensors mounted | aspen | oncley | |
29 | Wed 14-Jul-2004 | daisy rebooted 2-3 times | pine | oncley | |
28 | Wed 14-Jul-2004 | aspen booms mostly up | aspen | oncley | |
27 | Tue 13-Jul-2004 | Willow visit | willow | semmer | |
26 | Mon 12-Jul-2004 | Visit to Willow | willow | semmer | |
25 | Tue 06-Jul-2004 | 2m krypton at willow | willow | semmer | |
24 | Tue 06-Jul-2004 | Sonic work at willow | willow | semmer | |
23 | Tue 29-Jun-2004 | Sensor IDs at Pine | pine | semmer | |
22 | Mon 28-Jun-2004 | stuff at willow | willow | oncley | |
21 | Mon 28-Jun-2004 | daisy up at pine! | pine | oncley | |
20 | Thu 24-Jun-2004 | cosmos rebooted | willow | oncley | |
19 | Thu 24-Jun-2004 | mote23 erratic | willow | oncley | |
18 | Thu 24-Jun-2004 | emerald #1 died | willow | oncley | |
17 | Mon 21-Jun-2004 | Tsfc coefficients corrected | willow | oncley | |
16 | Mon 21-Jun-2004 | hilo installed | willow | oncley | |
15 | Sun 20-Jun-2004 | Changed willow 2m csat3 rate to 30hz | willow | maclean | |
14 | Fri 18-Jun-2004 | CUFF Breezecom antenna change | base | semmer | |
13 | Fri 18-Jun-2004 | cosmos (willow) back up | willow | semmer | |
12 | Fri 18-Jun-2004 | looking at relay values | all | maclean | |
11 | Tue 15-Jun-2004 | network to willow sick | willow | maclean | |
10 | Tue 15-Jun-2004 | network config | all | maclean | |
9 | Tue 15-Jun-2004 | data system time | all | maclean | |
8 | Tue 15-Jun-2004 | ndaqstatus | all | maclean | |
7 | Fri 11-Jun-2004 | Work at Willow | willow | semmer | |
6 | Fri 11-Jun-2004 | Coeffs for Rnet and Par on Willow | willow | semmer | |
5 | Fri 11-Jun-2004 | willow 2m TRH ? | willow | semmer | |
4 | Fri 11-Jun-2004 | Willow sensor IDs | willow | semmer | |
3 | Fri 11-Jun-2004 | Willow Installation | willow | semmer | |
2 | Wed 09-Jun-2004 | Willow system up | willow | maclean | |
1 | Mon 07-Jun-2004 | Logbook created | none | maclean |
- 158: co2, Site all, Fri 01-Oct-2004 15:34:47 MDT, Dry Ice in Hydra
-
On Sept 30th at ~15:40 MST: dropped a chunk of dry ice in the hydra box to check for any jar leakage.
- 157: co2, Site all, Fri 01-Oct-2004 15:26:48 MDT, "West" Hydra Inlet (along como creek)
-
Some notes about moving the west inlet for the hydra: 1. On Monday, August 16th at 14:50 MST: Repositioned the hydra west inlet to be directly above the creek (previously it was slightly to the side of the creek). Note: the old location of the inlet was about 20m North and 10m East of the creek. For more details of the old vs new inlet locations see: http://urquell.colorado.edu/sean/plots_cme/niwot_map_040818.ps 2. On Thursday, September 30th at ~15:30 MST: Moved the hydra west inlet from being 100cm above como creek to being 160cm above como creek (160cm above the water at como creek was approximately 100cm above the north bank of como creek). Photos of the location of the west inlet can be seen at: http://urquell.colorado.edu/photos/photos_040930.html (these photos also show the lower inlets of hydra on the pine profile)
- 156: status, Site all, Fri 01-Oct-2004 11:20:33 MDT, Daily status
-
Notes: -Last day of operations Looking through early 9/29 Willow Pine Aspen Mote Vbatt Ok OK OK (>2.7) Pressure OK OK OK Radiation OK OK OK Krypton(V) ------------------Kryptons got wet---------------------------- (>0.1) Tsoils A - OK A - 2 bad A -1 lg spike B - one lg spikes B - OK B- 2 spikes C - OK C - OK C -OK D - OK D - OK D - OK Sonics having problems OK Sonic temp & most likely from variance not getting wet looking good. Tsfc OK OK OK T/RH no data from 2m OK OK Wnd Spd OK 10 m had lg spike OK MR profiles OK OK OK co2 OK w'co2mr'.pine(2m) OK died on 9/29 1800 MST CO2 OK CO2 mr vs distance OK profiles have missing data.
- 155: status, Site all, Thu 30-Sep-2004 16:17:26 MDT, Daily status
-
Tasks: - reconnect 2 tsoilB sensors at aspen - disconnect 2 bad tsoilA sensors at pine -fix 2m tsfc sensors @ pine and aspen -fix 1m sonic at willow -fix 17m sonics at pine and aspen -fix 2m TRH at willow -fix 2m CO2 sensor @ pine Notes: -SITES MOST LIKELY HAD RAIN ON 9/29 Looking through early 9/29 Willow Pine Aspen Mote Vbatt Ok OK OK (>2.7) Pressure OK OK OK Radiation OK OK OK Krypton(V) ------------------Kryptons got wet---------------------------- (>0.1) Tsoils A - OK A - 2 bad A -1 lg spike B - some spikes B - OK B- OK C - OK C - 2 lg spikes C -OK D - OK D - OK D - OK Sonics 1m died @ 2000MST 17m flagged 17m lost @ 2m & 6m having problems died 9/28 1800 MST 9/28 10m variance plots 10m missing some look suspicious data Tsfc OK 2m died @ 1800 on lost 2m @ 1800 on 9/28 on 9/28 T/RH no data from 2m OK OK Wnd Spd OK OK 10m data gap MR profiles OK OK OK co2 OK w'co2mr'.pine(2m) OK died on 9/29 1800 MST CO2 OK CO2 mr vs distance OK profiles have missing data.
- 154: status, Site all, Wed 29-Sep-2004 16:15:21 MDT, Daily status
-
Tasks: - reconnect 2 tsoilB sensors at aspen - disconnect 2 bad tsoilA sensors at pine Notes: -Willow communication link back up -pine 2m CO2 sensor died -no data from 2m T/RH at willow -missing some latent heat measurements. -something strange happened at aspen at 1800 that affected all sensors Looking through early 9/28 Willow Pine Aspen Mote Vbatt Ok OK OK (>2.7) Pressure OK OK OK Radiation OK OK OK Krypton(V) OK OK OK (>0.1) Tsoils A - OK A - 2 bad A -missing data gap B - OK B - OK B- missing data gap C - 1 lg spike C - OK C -missing data gap D - OK D - OK D -missing data gap Sonics OK 17m flagged 17m died flagged lost on 9/28 it @ 1800 MST Tsfc OK OK lost 2m @ 1800 T/RH no data from 2m OK OK Wnd Spd OK OK OK MR profiles OK OK OK co2 OK w'co2mr'.pine(2m) OK died at 1800 MST CO2 none CO2 mr vs distance OK profiles have missing data.
- 153: hygro_thermometers, Site pine, Wed 29-Sep-2004 12:51:08 MDT, Test on T.2m.a
-
I tried another test on T.2m.a to see if we could find the noise source. THe 50Y probe was changed. The noise still exists. This test took place between 12:00 and 13:30 local time.
- 152: co2, Site aspen, Wed 29-Sep-2004 12:49:41 MDT, LICOR 7500 up on Marigold
-
THe Licor 7500 is now going through serial port 215 on Marigold (pine).
- 151: data_system, Site aspen, Wed 29-Sep-2004 11:33:16 MDT, marigold reboot
-
Just rebooted marigold (twice) to load configs which put Li7500 on channel 215, since 212's Emerald port was stolen by 200, etc.
- 150: LOG, Site all, Tue 28-Sep-2004 21:49:39 MDT, today's tasks
-
Chris and I arrived about 4:30! willow: - tried out the NETS e-net adaptor. it worked for my laptop, but wouldn't let any other devices (cosmos,aircoa1,aircoa3) through. ended up reinstalling breezecom (yet again!) after managing to completely shut off communication to the NETS Cisco box. - rebooted cosmos several times - left aircoa3 unplugged to see if this helps pine: - cycled power on upper breakout box, which revived CR10x (rads) - changed Hydra dessicant - removed Li7500 - retrieved my hat! aspen: - installed Li7500 and rebooted (to change config), but then marigold died. marigold back up when I checked at 9:30pm -- did Gordon fix something? li7500 data still not coming in. might be strange serial connections inside DAQ box. left site about 6:20pm
- 149: status, Site all, Tue 28-Sep-2004 16:05:35 MDT, Daily status
-
Tasks: - reconnect 2 tsoilB sensors at aspen - disconnect 2 bad tsoilA sensors at pine - move 6m T/RH sensor at aspen back to 2m Notes: -Willow communication link still down - basically no data since 9/26 - CO2 sensors at willow (2m and 17 m) stopped working on 9/25. Looking through early 9/27 Willow Pine Aspen Mote Vbatt communication link VbattC missing some OK (>2.7) still down data Pressure none OK OK Radiation none chk plot to see if OK sensor is working Krypton(V) none All may have gotten wet - voltage @ 0 (>0.1) at time thrroughout the day Tsoils A - none A - 2 bad A -OK B - none B - OK B- missing data gap C - none C - OK C - OK D - none D - OK D - OK Sonics none OK 2m and 17m flagged Tsfc none OK OK T/RH none OK no sensor @ 2m Wnd Spd none spike in 10m wind 15 & 17m missing spd @ 0000 MST some data MR profiles none OK OK co2 no calibrations OK OK 2 hilo sensors stopped working CO2 none OK OK
- 148: LOG, Site all, Tue 28-Sep-2004 13:36:52 MDT, some ids
-
Some sensor ids: Willow: kh2o.2m 1392 kh2o.17m 1391 Pine: kh2o.2m 1389 kh2o.30m 1133 csat.2m 672 csat.30m 674 Aspen: kh2o.2m 1390 kh2o.30m 1394 nuw.1m nuw6 (tram) csat.2m 677 gill.6m atik.10m 980505 atik.17m 980504 csat.30m 537 (536 initially)
- 147: status, Site all, Mon 27-Sep-2004 15:35:19 MDT, Daily status
-
Tasks: - reconnect 2 tsoilB sensors at aspen - disconnect 2 bad tsoilA sensors at pine - move 6m T/RH sensor at aspen back to 2m Notes: -Willow communication link was down for a time. - CO2 sensors at willow (2m and 17 m) stopped working on 9/25. Looking through early 9/26 Willow Pine Aspen Mote Vbatt communication link VbattC variable OK (>2.7) was down for a while Pressure OK OK OK Radiation OK chk plot to see if OK sensor is working Krypton(V) 2m dropped to 0 OK 2m dropped to 0 (>0.1) evening of 9/26 evening of 9/26 Tsoils A - 1 acting up A - 2 bad A -OK B - OK B - OK B- OK C - OK C - some missing data C - OK D - OK D - one lg spike D - missing data gap Sonics OK OK OK Tsfc OK OK OK T/RH OK OK 6m was moved from 2m back to 6m Wnd Spd OK OK OK MR profiles OK OK OK co2 no calibrations OK OK 2 hilo sensors stopped working CO2 OK OK OK
- 146: network, Site willow, Mon 27-Sep-2004 11:25:24 MDT, Willow down on 9/24, afternoon
-
While working at Aspen, Andy came by and said the communication link from Willow was down. So I stopped the work at Aspen to go to Willow. At Willow I found the Breezecom communication light was read not green. I recycled power on the breezecom and that got it going. Back at the CUFF trailer I rebooted cosmos to get it going.
- 145: hygro_thermometers, Site aspen, Mon 27-Sep-2004 11:17:15 MDT, work at Aspen on 9/24, TRH
-
I was working on the TRH sensors at Aspen between 1:30 and 3:30 on 9/24. During this time I moved the 6 meter TRH back up to 6 meters. TESTS: There was 3 tests I conducted on the 2m TRH. The first was to disconnect the TRH from the data system completely and see if noise was still existing on the temperature channel. The results showed a small amount of variation, approximately .02 C. It was not obvious if this was a noise problem of just random changes in the atmosphere. The second test was too put a fixed voltage reference in on the temperature channel. In this case the output signal was solid with no changes. The third test was with the reference signal as input with the TRH communicating with marigold. Based on Splus plots the noise was not present. As a fourth test we will change the 50Y probe. Unfortunately I do not have an extra probe. Will try in the next day or two.
- 144: data_system, Site all, Sat 25-Sep-2004 21:15:09 MDT, power glitch, data systems reboot
-
A power glitch today caused the data systems to reboot. Here are the messages in /usr/lib/powerchute/powerchute.log: 200000 09/25/04 12:06:31 UPS on battery 100300 09/25/04 12:06:31 Normal power restored: UPS on line 200003 09/25/04 12:46:13 UPS on battery: Blackout 051.3 V 100300 09/25/04 12:46:17 Normal power restored: UPS on line
- 143: status, Site all, Fri 24-Sep-2004 15:10:32 MDT, Daily status
-
Tasks: - reconnect 2 tsoilB sensors at aspen - disconnect 2 bad tsoilA sensors at pine - move 6m T/RH sensor at aspen back to 2m Looking through early 9/24 Willow Pine Aspen Mote Vbatt OK OK OK (>2.7) Pressure OK OK OK Radiation OK OK OK Krypton(V) OK OK OK (>0.1) Tsoils A - 1 acting up A - 2 bad A -some spikes B - 1 large spike B - OK B- 2 down & some missing data C - OK C - some missing data C -1 lg spike D - OK D - one sm spike D - OK Sonics data was flagged OK OK but look ok. Tsfc OK OK OK T/RH OK OK 6m was moved to 2m Wnd Spd OK OK OK MR profiles OK 6m may be too OK moist? co2 OK OK OK CO2 OK OK OK
- 142: status, Site all, Thu 23-Sep-2004 15:56:39 MDT, Daily status
-
Tasks: - reconnect 2 tsoilB sensors at aspen -willow 1m T/RH sensor crashed on 9/15 -pine 17m sonic died on 9/16 -aspen 17 m sonic died on 9/16 Looking through early 9/22 Willow Pine Aspen Mote Vbatt missing data between OK OK- batt changed (>2.7) 1400-0200 MST. 1 batt changed Pressure OK OK OK Radiation OK OK OK Krypton(V) OK OK OK (>0.1) Tsoils A - OK A - 2 bad A -1 lg spike B - OK B - 2 spikes B- 2 down C - OK C - OK C -1 spike D - OK D - some spikes D - OK Sonics Missing data from OK OK 1800-0200 MST snow on gills Tsfc OK OK OK T/RH 1m died on 9/15 OK 6m moved to 2m Wnd Spd OK OK OK MR profiles OK 6m may be too OK moist? co2 no calibration OK OK since 9/22 0000MST CO2 OK OK OK
- 141: LOG, Site all, Wed 22-Sep-2004 17:22:52 MDT, today's tasks
-
Aspen: - installed new hilo pump -- works a lot better (but needed to be connected to the transformer input - Moved TRH.6m to 2m to test affect of noise - changed mote 16 batteries - swapped HiCal cylinders with one of Sean's labeled 401.8ppm. I didn't remember how to set the regulator, so I just made it about equal to LoCal. Willow: - changed mote 20 batteries - installed D-Link e-net adaptor, but made things worse. Chris will go back up tonight to reinstall the Breezecom
- 140: status, Site all, Wed 22-Sep-2004 15:57:09 MDT, Daily status
-
Tasks: - reconnect 2 tsoilB sensors at aspen -willow 1m T/RH sensor crashed on 9/15 -pine 17m sonic died on 9/16 -aspen 17 m sonic died on 9/16 Notes: - storm blew in on 9/21 - no vbatt data from pine and aspen - kryptons got wet - sonics out of whack from snow Looking through early 9/21 Willow Pine Aspen Mote Vbatt OK no data after 0200 no data after 0200 (>2.7) Pressure OK OK OK Radiation OK OK OK Krypton(V) wet wet wet (>0.1) Tsoils A - OK A - 2 bad A - OK B - OK B - OK B- 2 down C - OK C - data sporadic C - OK D - OK D - OK D - OK Sonics Data heavily flagged data flagged data flagged data sporadic and sporadic and sporadic 1m sonic dying 1m sonic dying Tsfc OK OK OK T/RH 1m died on 9/15 OK OK Wnd Spd profiles missing profiles missing profiles missing data data data Gills way off! MR profiles OK OK OK co2 OK OK OK CO2 OK OK OK
- 139: co2, Site pine, Tue 21-Sep-2004 13:16:46 MDT, Huff&Puff cont'd